table 26
Table 14 Summary of performance for consent 7882-1.1 28
Table 15 Evaluation of environmental performance since 2018 29
List of figures
Figure 1 Mangapouri Cemetery location map 3
Figure 2 Burial Plan for first five years of operation 8
Figure 3 Groundwater elevations and rainfall at Egmont Village in 2022-2023 23
Figure 4 Groundwater levels Area A (GND2623 and GND2627) compared to minimum required water
table depths by burial type 24
Figure 5
performance for consent 5892-2 10
Table 4 Evaluation of environmental performance over time 11
List of figures
Figure 1 RNZ Waitara Road Facility map 3
Figure 2 Consent 5892-2 stormwater flow direction 4
page
1
1 Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2021 to June 2022 by the Council describing the monitoring programme
associated with a
new drilling, were canvassed and debated. The
tenor of the decision and the conditions attached to the approved marine consent clearly
confirm that offshore drilling in the Taranaki region has negligible if any environmental
effects, with the possible exception of marine biosecurity and on iwi interests, both of
which are able to be managed appropriately according to the DMC. Salient points from
the STOS decision are attached as Appendix 6.
One issue raised by submitters
19
Figure 4 Long-term TDS concentration GND2286 - 2287 Sep 2012-Nov 2016 20
List of photos
Photo 1 An example of an extracted soil core 10
Photo 2 Company supplied spreading map of the Oeo landfarm 13
page
1
1. Introduction
1.1 Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2015-June 2016 by the Taranaki Regional Council (the
Council) on the monitoring
location and approximate extent of the
Symes Manawapou Landfarm and approximate regional location (inset) 7
Figure 2 The Company supplied map detailing previously spread areas RNZ1, 2 &
3 and 15
Figure 3 Location of composite soil samples at the Symes Manawapou Landfarm 16
Figure 4 Groundwater monitoring well locations 17
Figure 5 Historic Total Dissolved Salt Concentration by monitoring well location 20
List of photos
Photo 1 Landfarm post application and reinstatement
investigations, and interventions summary table 13
Table 10 Summary of performance for consent 2046-3 14
Table 11 Summary of performance for consent 1389-3 15
Table 12 Evaluation of environmental performance over time 15
List of figures
Figure 1 Map of sampling sites, sewage disposal system and other features of interest at Urenui Beach
Camp 6
Figure 2 Map of sampling sites, sewage disposal system and other features of interest at Onaero Bay
Holiday Park 7
Figure 3 Urenui …
Partnership’s culvert installation consent 10209-1.1 10
Table 6 Evaluation of environmental performance over time 12
List of figures
Figure 1 TPJ Partnership's cleanfill and sampling sites at Rainie Road, Hawera 3
Figure 2 Map of TPJ Partnership retrospective and proposed piping 4
page
1
1 Introduction
Compliance monitoring programme reports and the Resource
Management Act 1991
1.1.1 Introduction
This report is for the period July 2022 to June 2023 by
the Pātea closed landfill site 39
Table 17 Summary of performance for Pātea closed landfill stormwater and leachate consent 0427-3 40
List of figures
Figure 1 Regional map of STDC closed landfills 5
Figure 2 Eltham landfill and sampling sites (not currently monitored) 6
Figure 3 Aerial view of Hāwera landfill and sampling sites 10
page
v
Figure 4 Hāwera landfill leachate chloride concentration 1999-2023 12
Figure 5 Hāwera landfill leachate filtered
Mangaroa Stream 17
Table 6 Summary of performance for Consent 7942-1.1 22
List of figures
Figure 1 Site map of the Vanner landfarm with application areas, dates and BTW
sample transects 13
Figure 2 Council soil sampling transect locations, areas F6 to F10 2014-15
monitoring period 15
Figure 3 Location of groundwater monitoring wells and stream samples from the
Mangaroa Stream, Vanner landfarm 15
List of photos
Photo 1 TAG Vanner landfarm location map with
committed to assisting
the Parihaka Papakāinga Trust with its
development aspirations and projects.
The Deed and Agreement arise out of Treaty
settlements with the iwi of Taranaki, in which
the Crown acknowledged the serious damage
that it inflicted by its past actions at Parihaka
and that its actions breached the Treaty of
Waitangi. This acknowledgement was
delivered in person by the Treaty Negotiations
Minister, Hon Chris Finlayson, at thetopher
reconciliation ceremony