Your search for 'iwi map' returned 2236 results.

NPDC Mangapouri Cemetery Annual Report 2022-2023

table 26 Table 14 Summary of performance for consent 7882-1.1 28 Table 15 Evaluation of environmental performance since 2018 29 List of figures Figure 1 Mangapouri Cemetery location map 3 Figure 2 Burial Plan for first five years of operation 8 Figure 3 Groundwater elevations and rainfall at Egmont Village in 2022-2023 23 Figure 4 Groundwater levels Area A (GND2623 and GND2627) compared to minimum required water table depths by burial type 24 Figure 5

Remediation New Zealand Ltd Waitara Road Facility Annual Report 2021-2022

performance for consent 5892-2 10 Table 4 Evaluation of environmental performance over time 11 List of figures Figure 1 RNZ Waitara Road Facility map 3 Figure 2 Consent 5892-2 stormwater flow direction 4 page 1 1 Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2021 to June 2022 by the Council describing the monitoring programme associated with a

Offshore Petroleum Drilling Review

new drilling, were canvassed and debated. The tenor of the decision and the conditions attached to the approved marine consent clearly confirm that offshore drilling in the Taranaki region has negligible if any environmental effects, with the possible exception of marine biosecurity and on iwi interests, both of which are able to be managed appropriately according to the DMC. Salient points from the STOS decision are attached as Appendix 6. One issue raised by submitters

Annual report 2015-2016

19 Figure 4 Long-term TDS concentration GND2286 - 2287 Sep 2012-Nov 2016 20 List of photos Photo 1 An example of an extracted soil core 10 Photo 2 Company supplied spreading map of the Oeo landfarm 13 page 1 1. Introduction 1.1 Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2015-June 2016 by the Taranaki Regional Council (the Council) on the monitoring

Annual report 2014-2015

location and approximate extent of the Symes Manawapou Landfarm and approximate regional location (inset) 7 Figure 2 The Company supplied map detailing previously spread areas RNZ1, 2 & 3 and 15 Figure 3 Location of composite soil samples at the Symes Manawapou Landfarm 16 Figure 4 Groundwater monitoring well locations 17 Figure 5 Historic Total Dissolved Salt Concentration by monitoring well location 20 List of photos Photo 1 Landfarm post application and reinstatement

Urenui & Onaero monitoring report 2019-2020

investigations, and interventions summary table 13 Table 10 Summary of performance for consent 2046-3 14 Table 11 Summary of performance for consent 1389-3 15 Table 12 Evaluation of environmental performance over time 15 List of figures Figure 1 Map of sampling sites, sewage disposal system and other features of interest at Urenui Beach Camp 6 Figure 2 Map of sampling sites, sewage disposal system and other features of interest at Onaero Bay Holiday Park 7 Figure 3 Urenui …

TPJ Partnership Cleanfill Annual Report 2022-2023

Partnership’s culvert installation consent 10209-1.1 10 Table 6 Evaluation of environmental performance over time 12 List of figures Figure 1 TPJ Partnership's cleanfill and sampling sites at Rainie Road, Hawera 3 Figure 2 Map of TPJ Partnership retrospective and proposed piping 4 page 1 1 Introduction Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1 Introduction This report is for the period July 2022 to June 2023 by

STDC Closed Landfills Annual Report 2022-2023

the Pātea closed landfill site 39 Table 17 Summary of performance for Pātea closed landfill stormwater and leachate consent 0427-3 40 List of figures Figure 1 Regional map of STDC closed landfills 5 Figure 2 Eltham landfill and sampling sites (not currently monitored) 6 Figure 3 Aerial view of Hāwera landfill and sampling sites 10 page v Figure 4 Hāwera landfill leachate chloride concentration 1999-2023 12 Figure 5 Hāwera landfill leachate filtered

Annual report 2014-2015

Mangaroa Stream 17 Table 6 Summary of performance for Consent 7942-1.1 22 List of figures Figure 1 Site map of the Vanner landfarm with application areas, dates and BTW sample transects 13 Figure 2 Council soil sampling transect locations, areas F6 to F10 2014-15 monitoring period 15 Figure 3 Location of groundwater monitoring wells and stream samples from the Mangaroa Stream, Vanner landfarm 15 List of photos Photo 1 TAG Vanner landfarm location map with

Recount 105 - June 2017

committed to assisting the Parihaka Papakāinga Trust with its development aspirations and projects. The Deed and Agreement arise out of Treaty settlements with the iwi of Taranaki, in which the Crown acknowledged the serious damage that it inflicted by its past actions at Parihaka and that its actions breached the Treaty of Waitangi. This acknowledgement was delivered in person by the Treaty Negotiations Minister, Hon Chris Finlayson, at thetopher reconciliation ceremony