Waste Remediation Services WRS Ltd Symes Manawapou Landfarm Annual Report 2020 2021

7 Long term TDS g/m3 monitoring GND2302 2012-2021 18 Figure 8 Long term chloride g/m3 monitoring GND2302 2012-2021 18 Figure 9 Long term EC mS/m @25°C monitoring GND2303 2012-2021 20 Figure 10 Long term TDS g/m3 monitoring GND2303 2012-2021 20 Figure 11 Long term chloride g/m3 monitoring GND2303 2012-2021 20 Figure 12 Sample location Lake Taumaha 21 Figure 13 WRS provided map of landfarmed areas 25 page iii List of photos Photo 1 WRS Symes

McKechnie Aluminium Solutions Ltd Annual Report 2023-2024

up as remnants were tracking towards the drain. By 27 June the waste bins with paint boxes had been cleaned up promptly, but the powder coating area was still generally messy with rubbish and it was advised to keep on top of housekeeping in this area. 2.1.2 Results of discharge and receiving water monitoring Sampling locations are described in Table 2 and indicated on the map in Figure 2. Table 2 Locations and details of sampling sites Site Location GPS coordinates Site code

Supplementary report - nutrient management tools/models

mitigation) using a range of tools and results are available in map and tabular displays. In summary, this analysis has identified a number of key findings:  There are environmental (including climatic; hydrological; fresh water ecology; soil characteristics) and on-farm practice differences between Taranaki and those areas of New Zealand that are facing greatest pressure upon land use conversion, and that these differences present a different context within which to consider

Patea Freezing Works detailed site investigation report

Mapping of fill 8 1.5.2 Trenching 8 1.5.3 Test pits 8 1.5.4 Groundwater monitoring wells 9 1.6 Asbestos 10 1.7 Electrical and mechanical equipment 10 1.7.1 PCBs and chemical drums 10 1.7.2 Tanks and vessels 11 1.8 Reservoirs 11 1.9 Fellmongery paint mix tanks 12 1.10 Surface water 12 1.11 Miscellaneous issues 12 2. Site identification 14 3. Site history 18 4. Site condition and surrounding environment 19 5. Geology and hydrology 21 5.1 Background groundwater quality 21

Kupe Production Station Annual Report 2021-2022

February 2007 Yes 3. Programme of installation to be provided Provided February 2007 Yes 4. Notification prior to maintenance work No maintenance during period under review N/A 5. Contingency plan to be provided Latest update received August 2016 Yes 6. Best practicable option to prevent or minimise adverse effects No maintenance during period under review N/A 7. Disturbance to comply with noise standards No maintenance during period under review N/A 8. Survey and map

Northern Quarries Biennial Report 2020-2022

compliance with consent 1509-4 over the 2020-2022 monitoring period 76 List of figures Figure 1 Map showing monitored quarrying locations in Taranaki 4 Figure 2 AA Contracting Ltd quarry site 11 Figure 3 Map of Jones Quarry Ltd Kekeua Road quarry, showing Mangaone Stream 7 15 Figure 4 Ferndene Quarries Ltd site location map, showing unnamed tributary 19 Figure 5 GR and LJ Jones Quarry site location map 29 Figure 6 Gibson Family Trust Puniho Road quarry site 36

Annual report 2016-2017

map Oeo Landfarm 13 Figure 4 Groundwater monitoring well locations Oeo Landfarm 16 Figure 5 Long term TDS record GND2287 Oeo Landfarm 2012-2017 19 page page 1 1. Introduction 1.1. Compliance monitoring programme reports and the Resource Management Act 1991 1.1.1. Introduction This report is for the period July 2016 to June 2017 by the Taranaki Regional Council (the Council) on the monitoring programme associated with

Annual report 2014-2015

Table 16 Origin Energy provided soil analysis Spence Road landfarm S15-S21 35 Table 17 Origin Energy provided soil results Spence Road landfarm S22-S26 36 Table 18 Origin Energy provided soil results Spence Road landfarm S27-S31 37 List of figures Figure 1 Aerial photograph of Geary landfarm with regional location inset 9 Figure 2 Origin Energy supplied application area map 13 Figure 3 Schrider landfarm and approximate regional location 18 Figure 4 Schrider Landfarm 25

TRC closing legal submissions 11 March 2022

3 Saddle Views Estate Ltd v Dunedin City Council [2014] NZEnvC 243, at [24]. 4 Te Runanga a Iwi O Ngati Kahu v Far North District Council [2010] NZEnvC 372, (2010) 16 ELRNZ 259, at [98] to [100], and [111]; Burgess v Selwyn District Council [2014] NZEnvC 11, at [74]; and Otway Oasis Soc Inc v Waikato Regional Council [2020] NZEnvC 169, at [15]. 5 Queenstown Lakes District Council v Hawthorn Estate Ltd [2006] NZRMA 424 (CA), at [75], [82] and [84]. page Page 5

Civil Quarries Ltd Everett Road Quarry Annual Report 2021/22

Glossary of common terms and abbreviations 21 Bibliography and references 23 page ii Appendix I Resource consents held by Civil Quarries Ltd Appendix II Categories used to evaluate environmental and administrative performance Appendix III Map of stormwater and washwater treatment system December 2020 List of tables Table 1 Resource consents held by the Company during the 2021-2022 monitoring period 5 Table 2 Locations and details of sampling