87(e) of the RMA and granted by Hon Chris Carter pursuant to the provisions
of section 119 of the RMA on 12 July 2003. It is due to expire on 1 June 2033.
There are seven special conditions attached to the permit.
page
9
Condition 1 requires the consent holder to map the position of the platform(s) and
provide a copy to the relevant authorities.
Conditions 2, 3 and 5 deal with public access.
Condition 4 requires the consent holder to adopt best practicable
Agenda for Hearing of submissions on Proposed Pest Management Plan & Draft Biosecurity Strategy October 2017.
page
Taranaki Regional Council Monthly Rainfall and Environmental
Data Report for February 2024
Note: The data presented here are provisional data only and may change as a result of quality control at a later date.
1. Rainfall
Map 1: February total rainfall (mm) and percentage of long-term mean (colour key).
page
Map 1a. Total rainfall 1 January to end February (mm) and percentage of long-term mean (colour key).
page
Table 1:
Taranaki Regional Council staff
• Land Management Team
• Contractors and consultants
External • Farm owners and managers
• Industry representatives
• Central and Regional government and ministry representatives
• Catchment groups
• Iwi and hapu
Changes to job description | Ngā huringa ki ngā whakaahuatanga mahi
From time to time it may be necessary to consider changes in the job description in response to
the changing nature of our work environment. Such changes,
in July 2023.
2.2.3 Receiving environment monitoring
Deposition gauge monitoring
A site map marking the location of the gauges around the Downer site is shown in Figure 4, with the
monitoring site locations also described in Table 2. The only monitoring location outside the boundary of
the site is AIR006305.
Material collected from the gauges was weighed for solid particulates and the results are shown in Table 3.
Table 2 Downer EDI Works Ltd monitoring location details
List of figures
Figure 1 Regional locations of the Company assets on Waitara Road, Brixton and Mokau Road, Uruti 4
Figure 2 Map of operational areas of the site 5
Figure 3 Stream and river monitoring locations 8
Figure 4 Map of upper Remediation NZ Ltd activities with former (designated with an ‘a’ after number)
and current sampling sites 32
Figure 5 Map of the downstream sites in the Haehanga Stream 32
Figure 6 Map of the Waikekeho reference site. Inset shows reference site (red box) in
Committee.
3.2 In response to matters raised at previous Consents and Regulatory Committee
meeting, the agenda report details stakeholder and iwi interests for each monitoring
report.
Recommended
THAT the Taranaki Regional Council
1. receives the 18-06 STDC Wai-inu Beach Settlement Monitoring Programme Annual
Report 2017-2018 and adopts the specific recommendations therein.
2. receives the 18-05 Todd Petroleum Limited Mangahewa-C Hydraulic Fracturing
Monitoring Programme
of discussions with iwi
and hapū; and
recommend a path forward to establish the committees.
page
Minutes Ordinary Meeting Tuesday 9 April 2019
Resolved
THAT the Taranaki Regional Council
1. receives the memorandum New Plymouth District Council (Waitara Lands) Act 2018
and duties and functions of the Taranaki Regional Council;
2. notes the Act requires the Council to constitute a Waitara River Committee for the
purposes of allocating funds