confining structures and
aquifer properties below 2000 mm deep were estimated from site visits, the topographic survey
and observation of site staff during construction activities. The influence that aquifer properties
below 2 metres have on groundwater velocities is uncertain, in terms of over and/or under
estimating velocities. For the current groundwater velocity calculations, the aquifer properties were
estimated as 'Silty Clay', with an effective soil porosity of 0. 01 or 1% to the base of the
required to hear and decide
the application to one or more hearing commissioners who
are not Taranaki Regional Councilors.
True
annotation http://legislation.govt.nz/act/public/1991/0069/latest/DLM2421549.html#DLM2421549 http://legislation.govt.nz/act/public/1991/0069/latest/DLM2421549.html#DLM2421549
annotation http://legislation.govt.nz/act/public/1991/0069/latest/DLM2421549.html#DLM2421549 http://legislation.govt.nz/act/public/1991/0069/latest/DLM2421549.html#DLM2421549
annotation
… page
98
The Council will charge a penalty of 10% on so much of any rates levied before 1 July 2021 which remain unpaid on 1 July
2021 or such later date as required under section 58(1) (b) (ii). (South Taranaki constituency).
A discount of 2% will be allowed on the total rates set for the financial year, if the rates for a financial year are paid in full
on or before the due date of the first instalment for the financial year (South Taranaki constituency only). This will
integrated with the SEM programme to save
duplication of effort and minimise costs. The purpose of annual SEM reports is to
summarise monitoring activity results for the year and provide a brief interpretation
of these results.
Annual SEM reports act as ‘building blocks’ towards the preparation of the regional
state of the environment report every five years. The Council’s first, or baseline, state
of the environment report was prepared in 1996 (TRC, 1996b), summarising the
region’s progress in
officer will check that your metering,
recording and telemetry equipment is functioning correctly.
What is telemetry?
Telemetry is the electronic transmission of data or
information from one place to another.
How does it work?
Your flowmeter is connected to a telemetry device. The
flowmeter generates electronic pulses each time a set
volume of water passes through the meter. These
pulses are recorded by the telemetry device, and
automatically transmitted
biodiversity.
This leaflet explains why the programme is
needed and how it works, and lists some of
the best ways for land occupiers to maintain
low possum numbers.
Why control possums?
Possums are the predominant pest animal in
Taranaki. They are a major threat because of
the actual or potential harm they do to
agricultural production, animal health and
indigenous biodiversity. They are pests
because they:
Compete directly with livestock
school at Tikorangi got their own beeswax wrap (above)
and Waitoriki (below) learnt how to do some Furoshiki
(Japanese gi� or bag folding), filled loads of plus Ecobricks
made Maths bags for the seniors. #plas�cfreejulytaranaki
What have our schools been doing?
Inglewood Primary School have really enjoyed
learning to weave kete and kono. #māoriperspec�ves
Term 3 JULY 2020Enviroschools Taranaki
We congratulate one of our Enviroschools whanau Rachel
Ammundsen from Moturoa School who
and Emerging Organic contaminants (EOCs)
in Groundwater 2018, in which the Taranaki Regional Council participated, and to
discuss their significance and answered questions arising.
Recommended
THAT the Taranaki Regional Council
a) receives the memorandum National Survey of Pesticides and Emerging Contaminants in
Groundwater 2018
b) notes the results of the survey, that pesticides are virtually undetectable in the
Taranaki groundwater or when present, are far below levels …
/^em^a6^ C^z) ̂ U
Pa ̂ ox 80^, /i/^ ffy^if^ 4^'^~
/^O /^gfcg^ /?^ ^W/
To be completed by persons who may be adversely affected
. I am the owner/occupier [delete as appropriate] or have some interest [specify below] in the property that
may be affected by the proposed activity.
n I have read the information provided or have been made aware of the proposed activity and its likely
environmental effects. (2)
. I have the authority to give approval for the proposal to proceed as described
programme to save
duplication of effort and minimise costs. The purpose of annual SEM reports is to
summarise monitoring activity results for the year and provide a brief interpretation
of these results.
Annual SEM reports act as ‘building blocks’ towards the preparation of the regional
state of the environment report every five years. The Council’s first, or baseline, state
of the environment report was prepared in 1996 (TRC, 1996b), summarising the
region’s progress in improving environmental