Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5324 results.

Pesticides in surface water in Taranaki 2019

determine whether there is any consequent environmental or human health issue due to pesticides in surface waters in Taranaki. Executive summary The Council’s Regional Freshwater Plan for Taranaki identifies the use of pesticides as an activity that needs to be appropriately managed in order to safeguard the ecological health of the region’s waterways and the health of those who rely on them, including through municipal water supplies. Also, the National Environmental Standard for Sources of

Annual report 2015-2016

by the Taranaki Regional Council (the Council) to assess the environmental performance during the period under review, and the results and effects of the consent holder’s activities. The Council’s monitoring programme included three regular inspections and two biological receiving water surveys. No intermittent wet weather overflows occurred during the period under review. Regular inspections indicated no problems with the ponds’ system maintenance or operation, with no unauthorised

Report 2013-2015

October 2014 are presented in this report. Monitoring included groundwater sampling at five sites and analysis of samples for a range of chemical and isotopic analysis. The results of the monitoring carried out by the Council indicates that the hydraulic fracturing activities undertaken by Todd have had no adverse effects on local groundwater resources. There were no Unauthorised Incidents recording non-compliance in respect of the resource consent, or provisions in regional plans, during the

Appendix 1: Abrasive blasting (electricity transmission)

Resource Management (National Environmental Standards for Electricity Transmissions Activities) Regulations 2009 Transmission line support structures: Discharges from blasting and applying protective coatings Regulation 25 Permitted activities (1) Blasting a transmission line support structure of an existing transmission line, or preparing the structure to receive protective coatings, is a permitted activity if all of the applicable conditions

Site 74

river field trips planned last term, only two had to be postponed because of bad weather or high river levels; unfortunately both involved the same school. If you have been to Pukeiti recently you would have seen the massive changes that are taking place involving the car parks and many of the buildings. Despite the action taking place, we have been, and still are, able to host school visits. It is extremely heartening to be involved with or hear about the

Geological hazards

action can be taken if there is any threat of an event. Taranaki is less likely to experience earthquakes and liquefaction than other regions because of the geographical distance from New Zealand’s major fault lines and the types of soil in the region. However, being on the coast means the region could be affected by storm surges or earthquake-created tsunami. The Taranaki coastline has high rates of erosion. A number of national and regional agencies and organisations are

Appendix Z - Uruti composting facility nitrogen balance

AECOM in Australia and New Zealand is certified to ISO9001, ISO14001 AS/NZS4801 and OHSAS18001. © AECOM New Zealand Limited (AECOM). All rights reserved. AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any third party who may rely upon or use this

5AEE AppendixC

site security and upkeep / maintenance of the site in accordance with this Plan. 3. 1.3 Site operating hours The operating hours of the site are generally 7:00am to 5:00pm daily but may vary to cater for specific needs of clients1 3. 1.4 Internal roads & tracks Internal roads and tracks are to be maintained to ensure that silt or spilt waste does not enter the Haehanga Stream. The Site Manager to check the tracks daily during rain events otherwise weekly page Appendix C is

Online Wave Survey data analysis & proposed regionally significant surf breaks

surf breaks included in the draft Coastal Plan for Taranaki, 2016, (draft Plan) were those identified as ‘high quality’ or ‘high value’ in the Regional Policy Statement for Taranaki, 2010 (Regional Policy Statement). These surf breaks were identified by local surfers and all known surf breaks were added to the Regional Policy Statement as no process for determining regional significance was developed at this time. As part of the development of the draft Plan and prior to

Site77

optimism. Last term was an extremely busy and varied one for me. It was a privilege to have the chance to be out and about with so many of you. I never tire of the sound of great excitement, glee or surprise when children discover some new animal or plant or do something that surprises both themselves and others. Certainly the many rock pool, Pukeiti and river excursions were great fun and my thanks go to the teachers who organized them. Bookings for this term are