decisions should they be stuck at
home, can’t get home, have to evacuate or
have no power, water, phone or internet.
What about fire drills in schools?
A fire drill is a method of practising how a
school should be evacuated in the event of a
fire. Usually, the school's existing fire alarm
system is activated and the school is
evacuated as if the emergency is occurring.
Students and teachers should practise getting
out of, and away from the school buildings as
Council indicates that the hydraulic fracturing activities
undertaken by Todd had no adverse effects on local groundwater or surface water resources.
There were no unauthorised incidents recording non-compliance in respect of the resource
consent, or provisions in regional plans, during the period under review.
Todd demonstrated a high level of environmental and administrative performance and
compliance with the resource consent over the reporting period.
page
For
surveys, four pond effluent and 36 downstream water samples collected for physicochemical analysis,
and two biomonitoring surveys of receiving waters.
The monitoring showed that activities at the Eltham WWTP were well managed. There were no issues with
operation of the plant or odour associated with plant processes. The level of the primary pond was well
managed by the diversion pumping system to Hawera, and the holding pond was not required to be used
as short-term storage. As a result of
had no significant adverse effects on local groundwater or surface water resources. There were no
unauthorised incidents recording non-compliance in respect of the resource consent held by GPL in relation
to these activities or provisions in regional plans, during the period under review.
GPL demonstrated a high level of environmental and administrative performance and compliance with the
resource consents over the reporting period.
For reference, in the 2017-2018 year, consent holders
physicochemical analysis in order to characterise the discharges and to determine
compliance with consent conditions.
The monitoring carried out by the Council indicates that the hydraulic fracturing activities undertaken by
GPL had no significant adverse effects on local groundwater or surface water resources. There were no
unauthorised incidents recording non-compliance in respect of the resource consents held by GPL in
relation to these activities, or provisions in regional plans, during the
scientific terms, and a bibliography, are
presented at the end of the report.
page
2
1.1.3 The Resource Management Act (1991) and monitoring
The Resource Management Act 1991 (RMA) primarily addresses environmental ‘effects’ which
are defined as positive or adverse, temporary or permanent, past, present or future, or
cumulative. Effects may arise in relation to:
(a) the neighbourhood or the wider community around an activity, and may
include cultural and
administrative performance with the resource consents. Effects from the discharge on the
receiving waters continue to be recorded, with minor or no effects noted beyond the boundary
of the permitted mixing zone.
For reference, in the 2015-2016 year, 71% of consent holders in Taranaki monitored through
tailored compliance monitoring programmes achieved a high level of environmental
performance and compliance with their consents, while another 24% demonstrated a good
level of environmental performance
technical data.
page
2
Section 3 discusses the results, their interpretation, and their significance for the
environment.
Section 4 presents recommendations to be implemented in the 2014 monitoring year.
A glossary of common abbreviations and scientific terms, and a bibliography, are
presented at the end of the report.
1.1.3 The Resource Management Act 1991 and monitoring
The Act primarily addresses environmental ‘effects’ which are defined as positive or
the
Company.
The Council’s monitoring programme for the period under review included ten inspections,
which looked at the plant processes and any potential or actual discharges to the receiving
watercourses and to air.
The monitoring showed that, generally, operations were carried out in a manner that was
environmentally sound. Some odour was noted beyond the boundary during inspections and
five incidents were recorded in relation to odour from the site over the three-year review
Taranaki Regional Council (the Council) adopted a water
management plan for the river in September 1991.
At the end of the 2014 monitoring period a total of 18 consents were held by the 13
industries monitored under this programme that discharge wastewater, stormwater and/or
leachate from the industrial area at Fitzroy, New Plymouth to the lower Waiwhakaiho River
and Mangaone Stream, or to land in the lower Waiwhakaiho and Mangaone Stream
catchments. The activities and impacts of the consent