Annual report 2016-2017

nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were detected beyond the boundary during inspections and there were no complaints in relation to air emissions from the site. During the year, the Company demonstrated an overall high level of both environmental performance and administrative compliance with the resource consents. There were no unauthorised incidents recorded by the Council in relation to the Company’s activities. The

Taranaki Biodiversity Forum Accord 2012

enhancing biodiversity generally, Accord partners also agree that there is a need for an immediate focus on Taranaki’s most valuable, yet vulnerable, biodiversity assets. The Accord identifies three immediate priorities for maintaining and enhancing biodiversity in the region. These are: 1. Protect the distribution and abundance of the 70 native animal species and 99 native plant species whose natural ranges include Taranaki and which have been listed as “threatened”, “at risk” or

web DOC appeal

6.1. Policy 2 – Integrated Management. 6.2. Policy 38 – Removal of Coastal Structures. Section 8 Regional Rules 6.3. Rule 22 – Placement or erection of a network utility structure. 6.4. Rule 35 – Structure maintenance, minor alteration or minor extension. 6.5. Rule 44 – Removal and demolition of a structure. Section 6 Methods of Implementation page 2 6.6. The decision to decline the Minister’s submission requesting a method that the Council

Report 2013-2014

performed. TAG Oil (NZ) Limited did not need to notify the Council of its intention to combust gas, as gas combustion activities were not undertaken at the Southern Cross wellsite or in association with this wellsite. No offensive or objectionable odours, smoke or dust associated with activities at the wellsite were observed. The drilling fluids and cuttings were disposed of at a consented off-site facility. During the monitoring period the Council received one incident investigation report

Annual report 2014-2015

Resource Management Act 1991 and monitoring 2 1.1.4 Evaluation of environmental performance 3 2. Stratford Power Station 5 2.1 Process description 5 2.2 Resource consents 7 2.2.1 Water abstraction permits 8 2.2.2 Water discharge permits 9 2.2.3 Air discharge permits 12 2.2.3.1 Taranaki Combined Cycle 1 (TCC 1 - operating) 12 2.2.3.2 Taranaki Combined Cycle 2 or Stratford Peaker 2 (TCC2 or SP2 – yet to be constructed) 13 2.2.3.3 Stratford Peaker Plant (SP1) 14 2.2.4 Discharge

Pātea Beach greenwaste monitoring 2018-2019

overall good level of environmental performance. The Council’s monitoring programme for the period under review included three compliance monitoring inspections of the site focussing on types of materials discharged, stormwater and leachate control, and emissions to air. The monitoring during the period under review showed that the closing of the site to the general public resulted in no unacceptable material being dumped on site. There were no issues noted relating to stormwater or

Cheal PS consent monitoring 2017-2018

complied with consent conditions. No adverse effects were observed in the tributary of the Mangawharawhara Stream at the time of inspections. There were no adverse effects on the environment found as a result of the exercise of the air discharge consent. Ambient air quality monitoring at the site showed that levels of carbon monoxide, combustible gases, PM10 particulates and nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were

Greymouth Petroleum northern sites consent monitoring 2017-2018

the communities in the stream. There were no adverse effects on the environment resulting from the exercise of the air discharge consent. The ambient air quality monitoring at the site showed that levels of carbon monoxide, combustible gases, PM10 particulates and nitrogen oxides were all below levels of concern at the time of sampling. No offensive or objectionable odours were detected beyond the boundary during inspections and there were no complaints in relation to air emissions from

Appendix L - Environmental & Safety Management Plan

best practice; • Ensure environmental effects (hazards) associated with the remediation of waste have been identified and that effective strategies for managing these are in place; • Identify waste streams and the management of these; • Provide procedures and guidelines for action in the event of a hydrocarbon or hazardous substance spill; page Health Safety Environment Interface Uruti Environmental Management Plan P-751-020-D Uruti Remediation Site Page 5 of 17

Colson Rd Landfill consent monitoring 2018-2019

the fact that the compliance point given in the consent is on the site boundary, at which point the Stream is piped, the downstream monitoring point is also downstream of other site discharges and further investigation is required. page Air quality monitoring showed that off-site there were no significant adverse effects in relation to suspended particulates, dust deposition rates or odour beyond the site boundary. An enclosed gas flare system was installed for air