Your search for ''nvOpzp; AND 1=1 OR (<'">iKO)),' returned 5168 results.

AEE Appendix 1 - Ōpunake Power Ltd

generation upon notification. It should be noted that the Company never knowingly generated when the lake level was at or below the minimum authorised level during the reporting period, and that leakage was the principal cause when a low lake level occurred. There is still concern about the sand inundation of the head of Opunake Lake, and the reduced recreational value that has resulted from this. The Company is continuing to investigate an array of options, including reducing the potential for

Ordinary meeting minutes December 2020

10 - Public Excluded Executive, Audit and Risk Committee Minutes – 7 December 2020 THAT the public conduct of the whole or the relevant part of the proceedings of the meeting would be likely to result in the disclosure of information where the withholding of the information is necessary to protect information where the making available of the information would be likely unreasonably to prejudice the commercial position of the person who supplied or who is the subject of the information. …

Candidate information handbook

Page 57 Letter to Appoint Scrutineer Return of Electoral Donations and Expenses Form page Page 2 Disclaimer: Every effort has been made to ensure that the information contained in this booklet is accurate and consistent with the Local Electoral Act 2001. The Taranaki Regional Council takes no responsibility for any errors or omissions. It is recommended that candidates obtain a full copy of the Act, which is available online at www.legislation.govt.nz. June

2019 Candidate Information Handbook - Taranaki Regional Council

… page 2019 CANDIDATE INFORMATION HANDBOOK TARANAKI REGIONAL COUNCIL LOCAL ELECTIONS C andidate Inform ation H andbook Taranaki Regional Council June 2019 page Disclaimer: Every effort has been made to ensure that the information contained in this handbook is accurate and consistent with the Local Electoral Act 2001. Taranaki Regional Council takes no responsibility for any errors or omissions. It is recommended that candidates obtain a full copy of the Act, which

Resource consents 10 July-20 August 2020

provided R2/10835-1.0 Commencement Date: 22 Jul 2020 Summerset Villages (Bell Block) Limited Expiry Date: PO Box 5187, Wellington 6140 Review Dates: Jun 2026 and 6-yearly thereafter Activity Class: Discretionary Location: 56 Pohutukawa Place, Bell Block Application Purpose: New To drill and construct a bore Rohe: Te Atiawa (Statutory Acknowledgement) Engagement or consultation: Te Kotahitanga o Te Atiawa Trust Comment on …

Stratford Power Station consent monitoring 2018-2019

are defined as positive or adverse, temporary or permanent, past, present or future, or cumulative. Effects may arise in relation to: a. the neighbourhood or the wider community around an activity, and may include cultural and social- economic effects; b. physical effects on the locality, including landscape, amenity and visual effects; c. ecosystems, including effects on plants, animals, or habitats, whether aquatic or terrestrial; page 2 d. natural and physical

Quarterly Operational Report September 2020

QUARTERLY OPERATIONAL REPORT – SEPTEMBER 2020 1 Executive summary This is the Quarterly Operational Report (QOR) for the three months ended 30 September 2020. The purpose of a QOR is to present a snapshot of the Council progressing through the delivery of the programme of activities agreed to in that year’s annual plan or long-term plan. It is designed to give a feel for how the Council is progressing and the forecast for the rest of the year. This QOR presents the achievement …

Appendix AA - irrigation block nitrogen analysis

from the irrigation areas were 3563 kg N/yr, or 992 kg N/ha/yr. (Based on 2019 irrigation areas). 2.2 Project Scope The scope of this report is confined to; • The areas on the Uruti site which include the Irrigation pond and the two irrigation areas, and; • The compost located on Pads 1 & 3 which is suitable to be spread onto the irrigations areas as a soil conditioner and fertiliser. The report is prepared on the basis that drilling mud deliveries cease on 31 December 2020. The

CPTrackedChanges

within the Officers report may be more complicated as the requested change may be from a different area of the Plan. Some minor and inconsequential changes have occurred. These have been identified in blue with new text being underlined and removed text being struck through. Minor and inconsequential amendments have been identified for the convenience of readers and have only occurred where necessary to improve the readability of Plan provisions, align language within the Plan, or to better

Public notice - Taranaki By-Products Limited

or simon@traverse.co.nz Location: Kohiti Road, Okaiawa Consent No: 2049-5.0 Application lodged: To discharge treated wastewater from a rendering operation and from a farm dairy into the Inaha Stream Consent No: 2050-5.0 Application lodged: To discharge cooling water and backwash water from a rendering operation into an unnamed tributary of the Inaha Stream Consent No: 2051-5.0 Application lodged: To take water from the Inaha Stream for a rendering operation