the monitoring period. Daily surface
water abstraction data was also assessed.
The monitoring indicated that the effects of the discharge of stormwater and process waters into the Kapuni
Stream were minimal. Inter-laboratory analysis indicated fairly good agreement between both parties.
Surface water abstraction was compliant for the whole monitoring period.
The review of the biological monitoring concluded that overall, the MCI scores for nearly all sites were
similar to or higher
generation upon
notification. It should be noted that the Company never knowingly generated when the lake level was at or
below the minimum authorised level during the reporting period, and that leakage was the principal cause
when a low lake level occurred.
There is still concern about the sand inundation of the head of Opunake Lake, and the reduced recreational
value that has resulted from this. The Company is continuing to investigate an array of options, including
reducing the potential for
client Airport Farm Trustee Limited, with
respect to the particular brief given to us and it may not be relied upon in other contexts or for any
other purpose, or by any person other than our client, without our prior written agreement.
We understand and agree that our client will submit this report as part of an application for resource
consent and that Taranaki Regional Council as the consenting authority will use this report for the
purpose of assessing that application.
Tonkin & Taylor Ltd
are defined as positive or adverse, temporary or
permanent, past, present or future, or cumulative. Effects may arise in relation to:
a. the neighbourhood or the wider community around an activity, and may include cultural and social-
economic effects;
b. physical effects on the locality, including landscape, amenity and visual effects;
c. ecosystems, including effects on plants, animals, or habitats, whether aquatic or terrestrial;
page
2
d. natural and physical
Page 57
Letter to Appoint Scrutineer
Return of Electoral Donations and Expenses Form
page
Page 2
Disclaimer: Every effort has been made to ensure that the information contained in this booklet is accurate and consistent with
the Local Electoral Act 2001. The Taranaki Regional Council takes no responsibility for any errors or omissions. It is recommended
that candidates obtain a full copy of the Act, which is available online at www.legislation.govt.nz.
June
… page
2019 CANDIDATE
INFORMATION HANDBOOK
TARANAKI REGIONAL COUNCIL
LOCAL ELECTIONS
C
andidate Inform
ation H
andbook
Taranaki Regional Council
June 2019
page
Disclaimer: Every effort has been made to ensure that the information contained in this handbook is accurate and consistent with the Local
Electoral Act 2001. Taranaki Regional Council takes no responsibility for any errors or omissions. It is recommended that candidates obtain a full
copy of the Act, which
Until May 2014, the site was known as Riverlands Eltham. The plant has an
associated wastewater treatment system from which treated effluent is disposed of either to land or to the
river. This report covers the Company’s processing season from October 2018 to September 2019 and
describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess
the Company’s environmental performance during the period under review. The report also details the
results of the
within the Officers report may be more complicated as the requested change may be from a different area of the Plan.
Some minor and inconsequential changes have occurred. These have been identified in blue with new text being underlined and removed text being struck through.
Minor and inconsequential amendments have been identified for the convenience of readers and have only occurred where necessary to improve the readability of Plan provisions, align
language within the Plan, or to better
within the Officers report may be more complicated as the requested change may be from a different area of the Plan.
Some minor and inconsequential changes have occurred. These have been identified in blue with new text being underlined and removed text being struck through.
Minor and inconsequential amendments have been identified for the convenience of readers and have only occurred where necessary to improve the readability of Plan provisions, align
language within the Plan, or to better
mechanical pulping pulp and paper residue [excluding any pulping wastes that
have been subject to chemical pulping or treated or mixed with any substance or
material containing chlorine or chlorinated compounds];
• Solid drilling cuttings from hydrocarbon exploration provided they are blended down
to a maximum
hydrocarbon content of 5.0 % total petroleum hydrocarbon within 3 days of being
onsite;
• Water based and synthetic based drilling fluids from hydrocarbon exploration
provided