informing
Committee members of significant activities undertaken by the Regional Waste
Minimisation Officer, in collaboration with the district council officers of New Plymouth
District Council, Stratford District Council and South Taranaki District Council.
2.2 Ag-Recovery workshops have been scheduled for May 2021. Fonterra have indicated that
they could assist with advertising via a letter drop from their tankers or advertising in
their newsletter.
2.3 It was noted that farmers won’t
again after ten years or earlier if required, to ensure that the requirements of the community
are met, and that the assets are maintained at their most effective levels of service.
1.4 Legislative requirements
The principal statute affecting the management of infrastructure assets is the Local
Government Act 2002 (the Act).
The Act empowers local authorities to provide a range of services. Specifically, the Act,
together with the Soil Conservation and Rivers Control Act 1941,
again after ten years or earlier if required, to ensure that the requirements of the community
are met, and that the assets are maintained at their most effective levels of service.
1.4 Legislative requirements
The principal statute affecting the management of infrastructure assets is the Local
Government Act 2002 (the Act).
The Act empowers local authorities to provide a range of services. Specifically, the Act,
together with the Soil Conservation and Rivers Control Act 1941,
increasing bureaucratic costs in our lives.
A firm believer and advocate for KISS management. I don't
believe our governments should be controlling our water or
enforcing your health requirements. Your land is your land, no
SNA or other should devalue your land without your permission
and compensation. I have an appreciation for the outdoors thus
Taranaki is where my heart is and I plan to make it a leader in
change
page
Taranaki Regional Council
New Plymouth General Constituency
Electing 5
Definitions
Aerated Static Pile - A composting method whereby a static compost pile or windrow is constructed
over a grid of perforated piping and a layer of bulking agent (such as wood chips) and/or compost.
Fans are used to force (inject) or draw (induct) air into the pile and support aerobic decomposition.
The pile may be topped with a layer of compost and/or wood chips to filter odorous compounds and
to provide insulation thereby maintaining a temperature adequate to destroy pathogens.
-
surveys on behalf of consent holders, to ensure compliance with
consent conditions and to assess impacts of various activities on stream health. Examples of activities that could impact on
stream health include direct discharges to a stream of treated wastewater or abstraction of water.
The results of the compliance monitoring are analysed and individual reports produced annually detailing the results of
those surveys. However, no overall analysis of the compliance monitoring data occurs. As …
the public is excluded from the following part of the proceedings of the
Executive, Audit and Risk Committee Meeting on Monday 22 June 2020 for the following
reasons:
Item 5 - Confidential Minutes - 17 February 2020
That the public conduct of the whole or the relevant part of the proceedings of the
meeting would be likely to result in the disclosure of information where the withholding
of the information is necessary to protect information where the making available of the …
used to conduct the analyses for this job. The detection limits given below are those attainable in a relatively simple matrix.
Detection limits may be higher for individual samples should insufficient sample be available, or if the matrix requires that dilutions be performed during analysis. A detection limit range
indicates the lowest and highest detection limits in the associated suite of analytes. A full listing of compounds and detection limits are available from the laboratory upon request.
GPL in relation
to these activities or provisions in regional plans, during the period under review.
GPL demonstrated a high level of environmental and administrative performance and compliance with the
resource consents over the reporting period.
For reference, in the 2019-2020 year, consent holders were found to achieve a high level of environmental
performance and compliance for 81% of the consents monitored through the Taranaki tailored monitoring
programmes, while for another 17%
The monitoring carried out by the Council indicates that the hydraulic fracturing activities undertaken by
Todd had no significant adverse effects on local groundwater or surface water resources. There were no
unauthorised incidents recording non-compliance in respect of the resource consent held by Todd in
relation to these activities or provisions in regional plans, during the period under review.
Todd demonstrated a high level of environmental and administrative performance and