page
227
CO AS TAL P L AN F O R TARANAK I S chedu le 5 – H i s t o r i c he r i t age
Ngaa Rauru Kiitahi
Ngaa Rauru Kiitahi used the entire coastal area from Te Awanui o Taikehu (Patea River) to
Te Kaihau-a-Kupe (Whanganui River mouth) and inland for food gathering, and as a
means of transport.
The coastal area was a rich source of all kai moana and bird life. Ngaa Rauru Kiitahi
exercised the values of Ngaa Rauru Kiitahitanga in both harvesting
V1.3
e
e
URUTI - REMEDIATION NZ LTD Page 1
Document No: RU-P-650-0500-A
Revision No V1.3
Date 10-9-2018
Controller: C Kay
page
e
e
Leachate & Stormwater
Management Plan
Table of Content
0.0 Terms and Definitions.............................................................................................3
1.0 Purpose of the Plan.................................................................................................4
2.0
page
1
CO AS TAL P L AN F O R TARANAK I S chedu le 5 – H i s t o r i c he r i t age
Ngāti Ruanui
The resources found within Te Moananui a Kupe since time immemorial, provided the
people of Ngāti Ruanui with a constant supply of food resources. The hidden reefs
provided kōura, pāua, kina, pupu, papaka, pipi, tuatua, and many other reef inhabitants.
Hapuka, moki, kanae, mako, and patiki swim feely between the many reefs that can be
found stretching out
page
YELLOW BRISTLE GRASS
The Ute Guide
Third Edition
page
Published by Ministry for Primary Industries, PO Box 2526, Wellington 6140
ISBN 978-0-478-42053-1 (Print); 978-0-478-42054-8 (Online)
Disclaimer
The information in this publication is not government policy. While every effort
has been made to ensure the information is accurate, the Ministry for Primary
Industries does not accept any responsibility or liability for error of fact, omission,
interpretation or
page
Application
Number
Applicant Lodged Date Type of application Description Activity Type Site location Catchment
21-02438-3.0 Trevor & Darryl Hucker 7-Sep-21 Replacement for expiring consent To discharge farm dairy effluent onto land Discharge Permit 114 Surrey Road, Tariki Waitara
page
221
CO AS TAL P L AN F O R TARANAK I Append ices
Appendix 1 – Agreed river mouths and coastal marine area boundaries
This appendix describes the location of the mouths of the rivers named in this appendix. The positions of the coastal marine area landward boundary (calculated on the basis of five times
the width at the river mouth) are included for reference purposes. Both boundaries are agreed to be a line perpendicular to the flow of the river through
Fighting Protocols
3.1.6.2 Standard Workplace
Instructions
Associated documents
Operating
e
J
//
~~
URUTI - REMEDIATION NZ LTD Page 1
Document No RU-P-650-0300-A
Revision No: 1.2
Date:20-9-2018
Document Controller: C Kay
page
e
e
Site Practices Plan
Table of Content
0.0 Terms and Definitions.............................................................................................3
1.0 Purpose of the
Reviewed Approved
V1.1 26-7-2018 Draft for review
C Kay
page
Site Exit Plan
URUTI - REMEDIATION NZ LTD Page 2
Document No:RU-650-1100-A
Revision No:1.1
Date:26-7-2018
Controller: C Kay
Table of Content
0.0 Terms and Definitions ............................................................................................. 3
1.0 Purpose of the Plan
.........---............ --.--.
--~---,/ ~
---------/
To complete:
4.0 Incoming Material Pad 2
Develop a new diagram
'-,
e
J
/-~
~~
REMEDIATION NZ L TO Page 1
Document No:RU-650-0400-A
Revision No: 1.2
Date:27 -9-2018
Controller: C Kay
page
e
e
Wetland Treatment System
Management Plan
Table of Content
0.0 Terms and Definitions.............................................................................................3
1.0 Purpose of the
page
e
-
URUTI COMPOSTING &
VERMICUL TURE FACILITYRemediation [NZl ltd.
Il ~1I111!nd1lt11 ftib ~ fmfllilJ
Waste Acceptance Plan
Document No: RU-650-0200-
Revision No: 1.2
Date: 20-9-2018
page
Waste Acceptance Plan
Version Control
Version Date Description Prepared Reviewed Approved
26-7-2018 Draft for review
C Kay
V1.1
Draft for review
C Kay
V1.2 20-9-2018
e
~-
To complete:
3.3 TRC approval of new waste
Need to develop a