identify what areas are prone to erosion and get
the funding. We’ve been able to revert steep,
unproductive land and give our stock some shelter
and shade – at minimal cost. Better to work with
and get ahead of regulationthe Council, .”
page
Get erosion
Taranaki Regional Council has erosion support
funding available for hill country farmers. To
apply for funding, get in touch with our Land
Management team.
Contact us today to get started
0800 736 222
see a draft report for comment? Yes
Processing timeframes
The RMA specifies timeframes for processing resource consent applications (for example 20 working days for a non-notified
application), however these timeframes can be extended with the applicant's agreement.
Do you agree to the Taranaki Regional Council extending RMA
consent processing timeframes?
NA
Surrender of existing consent
Please note that your existing consent is to be surrendered on the granting of
Gardens areū
proudly owned by the Taranaki Regional Council
for the Taranaki community and their visitors.
Pukeiti
Rainforest
Day walks
2290 Carrington Road,
New Plymouth.
Patuha Track 1. km2
kmTe Iringa Track 0.8
1. kmKaitake Track 6
1.0 kmSummit Track
Jubilee Track 1.3 km
1.6 kmSaxton Track
0.7 kmRimu Track
(further 400m to summit)
For thousands of years Pukeiti was unspoiled virgin
rainforest. Most of the Rimu were removed in a decade
during logging in the
Please provide details Consent 6390-1 authorises the impounding of water behind a
small weir on the Motukawa Race.
Existing dams/weirs generally do not need a resource consent if they are less than 3m high, do not restrict fish passage and
the upstream catchment is less than 25ha. If a dam is to be constructed it must also meet other standards relating to
environmental effects during construction. Please refer to Rule 59 of the Regional Fresh Water Plan. or contact the Council for
details
see a draft report for comment? Yes
Processing timeframes
The RMA specifies timeframes for processing resource consent applications (for example 20 working days for a non-notified
application), however these timeframes can be extended with the applicant's agreement.
Do you agree to the Taranaki Regional Council extending RMA
consent processing timeframes?
NA
Surrender of existing consent
Please note that your existing consent is to be surrendered on the granting of
conditions To discharge stormwater to an unnamed tributary of the Waiongana Stream Discharge Permit Waitara Roundabout SH3 Waiongana
24-05305-2.0 5305-2.0 KiwiRail Holdings Limited 20-Nov-24 Replacement for expiring consent To maintain boulder rock revetment protection works on the New Plymouth foreshore between
Kawaroa Park and Tasman Prospect
Coastal Permit New Plymouth foreshore between Kawaroa Park and Tasman
Prospect
Huatoki
24-11326-1.0 11326-1.0 New Plymouth District Council 20-Nov-24
page
Taranaki Regional Council Monthly Rainfall and Environmental
Data Report for February 2024
Note: The data presented here are provisional data only and may change as a result of quality control at a later date.
1. Rainfall
Map 1: February total rainfall (mm) and percentage of long-term mean (colour key).
page
Map 1a. Total rainfall 1 January to end February (mm) and percentage of long-term mean (colour key).
page
Table 1:
they are less than 3m high, do not restrict fish passage and
the upstream catchment is less than 25ha. If a dam is to be constructed it must also meet other standards relating to
environmental effects during construction. Please refer to Rule 59 of the Regional Fresh Water Plan. or contact the Council for
details of these additional standards.
Does the dam/weir need a resource consent? No
Describe the method of taking in detail including any
structure necessary to facilitate taking
to
environmental effects during construction. Please refer to Rule 59 of the Regional Fresh Water Plan. or contact the Council for
details of these additional standards.
Does the dam/weir need a resource consent? Yes, an application will be lodged
Describe the method of taking in detail including any structure
necessary to facilitate taking of water.
In association with the separate consent application for 'the use
and maintenance of an existing diversion weir, intake structure
............................................................................................................................... 12
3.1 Department of Conservation ...................................................................................................... 12
3.2 New Plymouth District Council ................................................................................................... 12
3.3 Taranaki Regional Council ......................................................................................................... 13
3.4 Tai Whenua, Tai Tangata, Tai Ao Te Atiawa Iwi Environmental Management