2020-2021 277 53 11 0 0**
2019-2020 No injection during the monitoring period
2018-2019 208,768 1,549 67 85 30
* calculated using daily volume and hours ** well is operating as a vacuum
Figure 4 Waihapa-5 well: Daily injection volumes and injection pressures (2018-2022)
2.3.2 Summary of injection activities at the Waihapa-F wellsite (consent 4094-2)
Injection via the Waihapa-7A well ceased on 6 August 2018 and no further injection is planned. The well is
currently shut-in awaiting
Ordinary Council meeting agenda July 2019
inclusive of GST.
2. appoints the New Plymouth District Council, the Stratford District Council and the
South Taranaki District Council, pursuant to section 53 of the Local Government
(Rating) Act 2002, to collect the rates set by the Taranaki Regional Council.
3. delegates to the New Plymouth District Council, the Stratford District Council and
the South Taranaki District Council the power to postpone and remit rates pursuant
to the relevant adopted Rates Remission and Postponement Policy.
the receiving water compliance survey of 19 June 2015
Site WGA000361 PGP002002 WGA000363
Parameter Unit upstream discharge 50 metres
downstream
Time NZST 1200 1215 1230
Temperature °C 13.0 12.9 13.0
Conductivity @ 20°c mSm 5.8 287 5.9
Chloride g/m³ 9.39 318 9.45
pH 7.1 7.9 7.2
BOD5 (total) g/m³ - 53 -
BOD5 (carbonaceous filtered) g/m³ 2.2 - 2.1
Ammoniacal nitrogen g/m³N 0.173 232 0.276
Un-ionised ammonia g/m³N 0.0006 5.1113 0.0012
Dissolved reactive phosphorus g/m³P 0.050 -
and evens street address system).
Condition 11
When the mean daily flow in the Mangatete Stream at the Saunders Road bridge is less than 120 L/s for a
period of seven or more consecutive days, the consent holder shall enforce ‘level 2’ water restrictions. These
restrictions may only be lifted when the mean daily flow is greater than 120 L/s for a period of seven or
more days. ‘Level 2’ restrictions include a total ban on using sprinklers, irrigation systems and hand held
hoses.
Taranaki State of the Environment Report 2009.
NPDC Colson Rd Landfill consent monitoring report 2017-2018
page
iii
9.2 Results 52
9.2.1 Inspections 52
9.2.2 Results of receiving environment monitoring 52
9.3 Evaluation of performance 53
10 Schlumberger New Zealand Ltd 54
10.1 Site description 54
10.2 Results 55
10.2.1 Inspections 55
10.2.2 Results of discharge monitoring 56
10.3 Evaluation of performance 57
11 Tasman Oil Tools Ltd 60
11.1 Site description 60
11.2 Results 61
11.2.1 Inspections 61
11.2.2 Results of discharge monitoring 62
29 ‘Activity first established’ means the date an air discharge consent was first issued by the Taranaki Regional Council for the activity.
30 Excludes any activities associated with plant establishment, such as earthworks and the installation of structures, buildings and equipment.
page
53 Regional Air Quality Plan for Taranaki
Activity Rule Standards/Terms/Conditions Classification Notification Control/Discretion Policy
Reference
f) Location of
granted by the
Taranaki Regional Council
Name of
Consent Holder:
Groundworkx Taranaki Limited
126 Orlando Street
Stratford 4332
Decision Date: 15 January 2018
Commencement Date: 15 January 2018
Conditions of Consent
Consent Granted: To discharge green waste and any resulting contaminated
stormwater and leachate to land
Expiry Date: 1 June 2034
Review Date(s): June 2022, June 2028
Site Location: Victoria Road, Stratford
Grid