Your search for 'plan' returned 2962 results.

Lower Waitara River Flood Control Scheme Asset Management Plan

page Lower Waitara River Flood Control Scheme Asset Management Plan Updated 28 August 2020 Lower Waitara River Flood Control Scheme Asset Management Plan Taranaki Regional Council Private Bag 713 Stratford 4352 28 August 2020 Document: 1939592 page Lower Waitara River Flood Control Scheme Asset Management Plan Updated 28 August 2020 Table of Contents

New Zealand Energy Corporation DWI Annual Report 2022-2023

submit a wide range of data under the conditions of their DWI consents. As required by the conditions of their consents, the Company has submitted an Injection Operation Management Plan for each active injection well. The plans are required to include the operational details of the injection activities and to identify the conditions that would trigger concerns about the integrity of the injection well, the receiving formation or overlying geological seals. The plans are also required to

OMV NZ Pohokura Production Station Annual Report 2022-2023

data acquisition to come within two kilometres of the shoreline in water depths of 10 m. The survey was followed up with 70 km2 of transitional 3D seismic that overlapped and linked with existing onshore seismic data. In 2002, detailed design and planning of the field, including the resource consenting process began, with construction commencing in 2005. In 2006, the major milestone of commercial gas to market was achieved from the three onshore wells. Development of the field involved

Westown Haulage Cowling Road Annual Report 2022-2023

Reinspection found that the abatement notice had been complied with. The improvement that had been required in the Company’s administrative performance in the 2021- 2022 year due to the lack of provision of the Erosion and Sediment Control Plan was achieved early in the 2022-2023 year. For reference, in the 2022-2023 year, consent holders were found to achieve a high level of environmental performance and compliance for 878 (87%) of a total of 1007 consents monitored through the Taranaki tailored

A farm operators guide to FWFP mapping Te Uru Kahika

............................................................................................................................... 8 page 3 This guide is designed to be read alongside “A farm operator’s guide to writing a freshwater farm plan”. This guide outlines the maps you need to provide to meet freshwater farm plan (Plan) certification requirements, gives advice on creating maps, and has useful checklists at the end to make sure all certification requirements are met. Maps to be provided in a Plan To meet certification requirements, you’re required

Dow Chemical NZ Ltd Annual Report 2022-2023

standalone pumps. This avoided the need for offsite discharges during the demolition phase when there was increased risk of entrainment of contaminants. The irrigation is permitted under Rule 29 of the Council’s Regional Fresh Water Plan which allows discharges of contaminants from industrial premises onto land. The likely contaminants of concern, 1 The Council has used these compliance grading criteria for more than 19 years. They align

Ordinary Council Agenda October 2023

page Tuesday 31 October 2023, 10.30am Ordinary Council - Cover 1 page Ordinary Council 31 October 2023 10:30 AM - 12:00 PM Agenda Topic Page 1. Cover 1 2. Confirmation of Ordinary Council Minutes - 19 September 2023 3 3. Confirmation of Operations and Regulatory Minutes - 10 October 2023 11 4. Confirmation of Policy And Planning Minutes - 10 October 2023 17 5. Confirmation of Executive Audit and Risk Committee - 24 October 2023 22 6. Future for

WestSide New Zealand Rimu Production Station Annual Report 2022-2023

2022-2023 period found that the site was tidy and well managed. The Rimu Production Station was shut down in August 2022. The site is currently holding low pressure nitrogen/air as an internal moth balling preservative. The consents for the Manutahi-E, F, and H wellsites have been left to expire, while Kauri-D and Manutahi-C wellsites have both been removed and the sites converted to grass. The Company have plans to put some low producing oil wells back on line in the Kauri field in late

Appendix I - groundwater, soil & stream monitoring plan

page URUTI COMPOSTING & VERMICULTURE FACILITY Groundwater Soil & Stream Monitoring Plan Document No:RU-P-650-0600-A Revision No: 1.3 Date: 27 September 2018 page Environment Monitoring Plan URUTI - REMEDIATION NZ LTD Page 1 Document No:RU-P-650-0600-A Revision No: V1.3 Date:27-9-2018 Document Controller: C Kay Version Control Version Date Description Prepared

Todd Generation Taranaki Ltd McKee Power Plant Annual Report 2022-2023

visual inspection Yes 6. Prepare and maintain contingency plan Plan approved (February 2018) Yes page 11 Purpose: To discharge wastewater and stormwater from a retention pond at the McKee Power Plant and Organic Rankine Cycle Plant, into water and onto land where it may enter an unnamed tributary of the Mangahewa Stream Condition requirement Means of monitoring during period under review Compliance achieved? 7. Prepare and maintain stormwater management