Your search for 'Building' returned 1424 results.

Consents issued 19 January-1 March 2018

page Consent Holder Subtype Primary Industry Purpose R2/5983-2.0 South Taranaki District Council Structure - Protection (Coastal) Building Construction/Drainage/Flood Control R2/10545-1.0 Westside New Zealand Limited Structure - Other (Coastal) Hydrocarbon Exploration Consent Holder Subtype Primary Industry Purpose R2/0715-4.1 DH Lepper Trust Land/Water - Animal Waste Piggery Farm R2/1958-3.0 MLTT Trust Land - animal waste Dairy Farm R2/2804-3.0 MI & PM Stevenson Family

Annual report 2016-2017

building air extraction and vent treatment system for improved odour control was completed in 2011 for the warehouse where 2,4-D acid is stored;  the pilot plant and TCP plant were demolished in 2014;  the amine neutralisation of glyphosate was ceased in 2013; and  the esterification of 2,4-D was ceased in 2015. 1.2.2 Herbicides Plant Formulations involving a wide range of active ingredients are prepared for sale. Both liquid (water and solvent based) and granular herbicides are

Annual Report 2014/2015 - full document

with the building blocks of a new, combined Regional Freshwater and Land Management Plan now firmly in place. In its draft form, the plan signals a switch to land disposal as the norm for dairy effluent treatment, and also proposes to lock in completion of the Council’s world-scale Riparian Management Programme by mid 2020. Notably, and in contrast to some other regions, it does not propose to introduce nutrient caps and limits beyond the mandatory requirement. Our research suggests there

pp1106

Budget breakdown to 2023:Vote 2018/19 2019/20 2020/21 2021/22 2022/23 Capital Lands - 1.875 1.875 1.875 1.875 - Strengthening the Integrity of the Environmental Management System 14. Led by the Minister for Biosecurity, this 34.4 million initiative aims to build greater resilience and more effective risk management in the biosecurity system. This will be done through providing funding for:  fit-for-purpose workforce planning and management systems to ensure New Zealand's

Appendix 5: Review of interim asbestos hazard control

discussion with them. Fire damage is widespread with much but not all of the site destroyed. Considerable corrugated asbestos cement sheeting debris is evident in two areas in particular. These approximate areas are marked up on 1964 site plan provided to us. There is an area of approximately 10,000 m² between the Boiler House and the remaining partially damaged buildings to the east of the site that formerly comprised the Freezer and Storage Building and abattoir Building. The other significant

Stormwater Management Plan template

Attachment A. Your site plan should include: body_Text · Layout of buildings and all outdoor activity areas body_Text · Vehicle traffic areas and loading/unloading areas body_Text · Areas of existing and/or potential soil erosion body_Text · Areas of historic contamination body_Text · Storage areas, particularly of hazardous substances or materials body_Text · Stormwater flow paths and ponding areas body_Text · Private and public stormwater drains, manholes, catchpits and soakholes with

Biennial report 2012-2014

was going into the second pond. Clean fill was being dumped along side of the existing speedway track to build up the bank and to re contour the paddock. The area looked good. 24 May 2013 The inspecting officer met onsite with the quarry manager. The plant was in use at the time of inspection. It was found that the pipe running from the small pond was blocked and wash water was discharging over land and into the unnamed tributary. The stream was discoloured below the discharge point.

Site 79

occasions, on weekends. This year the theme for Get Ready Week is Prepared Kids. The Ministry of Civil Defence Emergency Management (MCDEM) is launching its redeveloped schools resource 'What's the Plan Stan?' on 10 October as part of Get Ready Week 2016. The new resource is designed to encourage schools to update their emergency preparedness plans and to build resilience as a life skill for their students. The aim is also for students to encourage their families to be more prepared. If

Annual report 2014-2015

of 6 months of the year; • the esterification process of 2,4-D esters recommenced in October 2005, in the Commodity Herbicides Plant; • the neutralisation process with amines of MCPA (2006) and 2,4-D (2007) recommenced, and of glyphosate (2007) and clopyralid (2012) commenced, in the Commodity Herbicides Plant; and • a new building air extraction and vent treatment system for improved odour control was completed in 2011 for the warehouse where 2,4-D acid is stored.