page
Consent Holder Subtype Primary Industry Purpose
R2/5983-2.0 South Taranaki District Council Structure - Protection (Coastal) Building Construction/Drainage/Flood Control
R2/10545-1.0 Westside New Zealand Limited Structure - Other (Coastal) Hydrocarbon Exploration
Consent Holder Subtype Primary Industry Purpose
R2/0715-4.1 DH Lepper Trust Land/Water - Animal Waste Piggery Farm
R2/1958-3.0 MLTT Trust Land - animal waste Dairy Farm
R2/2804-3.0 MI & PM Stevenson Family
building air extraction and vent treatment system for improved odour control was completed
in 2011 for the warehouse where 2,4-D acid is stored;
the pilot plant and TCP plant were demolished in 2014;
the amine neutralisation of glyphosate was ceased in 2013; and
the esterification of 2,4-D was ceased in 2015.
1.2.2 Herbicides Plant
Formulations involving a wide range of active ingredients are prepared for sale. Both liquid (water and
solvent based) and granular herbicides are
with the building
blocks of a new, combined Regional Freshwater and Land
Management Plan now firmly in place. In its draft form, the
plan signals a switch to land disposal as the norm for dairy
effluent treatment, and also proposes to lock in completion
of the Council’s world-scale Riparian Management
Programme by mid 2020. Notably, and in contrast to some
other regions, it does not propose to introduce nutrient caps
and limits beyond the mandatory requirement. Our research
suggests there
Budget
breakdown
to 2023:Vote 2018/19 2019/20 2020/21 2021/22 2022/23 Capital
Lands - 1.875 1.875 1.875 1.875 -
Strengthening the Integrity of the Environmental Management System
14. Led by the Minister for Biosecurity, this 34.4 million initiative aims to build greater
resilience and more effective risk management in the biosecurity system. This will be
done through providing funding for:
fit-for-purpose workforce planning and management systems to ensure New
Zealand's
discussion with them.
Fire damage is widespread with much but not all of the site destroyed. Considerable corrugated
asbestos cement sheeting debris is evident in two areas in particular. These approximate areas are
marked up on 1964 site plan provided to us. There is an area of approximately 10,000 m² between the
Boiler House and the remaining partially damaged buildings to the east of the site that formerly
comprised the Freezer and Storage Building and abattoir Building. The other significant
Attachment A. Your site plan should include:
body_Text · Layout of buildings and all outdoor activity areas
body_Text · Vehicle traffic areas and loading/unloading areas
body_Text · Areas of existing and/or potential soil erosion
body_Text · Areas of historic contamination
body_Text · Storage areas, particularly of hazardous substances or materials
body_Text · Stormwater flow paths and ponding areas
body_Text · Private and public stormwater drains, manholes, catchpits and soakholes with
was going into the second pond. Clean fill
was being dumped along side of the existing speedway track to build up the bank
and to re contour the paddock. The area looked good.
24 May 2013
The inspecting officer met onsite with the quarry manager. The plant was in use at
the time of inspection. It was found that the pipe running from the small pond was
blocked and wash water was discharging over land and into the unnamed tributary.
The stream was discoloured below the discharge point.
occasions, on weekends.
This year the theme for Get Ready Week is
Prepared Kids. The Ministry of Civil Defence
Emergency Management (MCDEM) is launching
its redeveloped schools resource 'What's the
Plan Stan?' on 10 October as part of Get Ready
Week 2016.
The new resource is designed to encourage
schools to update their emergency preparedness
plans and to build resilience as a life skill for their
students. The aim is also for students to
encourage their families to be more prepared.
If
of 6 months of the year;
• the esterification process of 2,4-D esters recommenced in October 2005, in the
Commodity Herbicides Plant;
• the neutralisation process with amines of MCPA (2006) and 2,4-D (2007)
recommenced, and of glyphosate (2007) and clopyralid (2012) commenced, in
the Commodity Herbicides Plant; and
• a new building air extraction and vent treatment system for improved odour
control was completed in 2011 for the warehouse where 2,4-D acid is stored.