Your search for 'rain fall' returned 1977 results.

Annual report 2014-2015

water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. page 6 Trustpower holds water permit 0489-2 to cover the damming and diversion of the Patea River from Lake Rotorangi through the intake and spillways. This permit was issued by the Council on 25 June 2009 under Section 87(e) of the RMA, and following appeal, commenced on 17 December 2010. Trustpower

Recount 97 - June 2015

after intense rainfall on 19 and 20 June resulted in widespread flooding and slips and severe disruptions to roading and electricity networks throughout Taranaki. A Civil Defence State Of Emergency was declared at 9pm on Saturday 20 June, and remained in place for a week. The heaviest rain was in inland South Taranaki but throughout the region, about 60 local roads were blocked by slips and washouts and in at least one case, repairs are expected to take

SOE2022 River Water Quality

growth of multiple species and approaching acute impact level for sensitive species at higher concentrations). The national bottom line sits between bands B and C. For nitrate, all 15 sites monitored in Taranaki achieved national bottom lines, with all but three falling in band A for both the annual median and 95th percentile measures. The sites in band B were in mid and lower parts of southern ring plain catchments, which are areas of more intensive pastoral

SOE2022 Lakes Wetlands

When compared to criteria set out in the National Objectives Framework (NOF), Lake Rotorangi falls within band B for TLI Score Description Classification 0 - 2 Microtrophic: The lake is very clean with very low levels of nutrients and algae. The lake can have snow or glacial sources. Very good >2 - 3 Oligotrophic: The lake is clear and blue, with low levels of nutrients and algae Good >3 - 4 Mesotrophic: The lake has moderate levels of nutrients and algae. Fair >4 - 5

Appendix J - organic composting protocols (vermiculture only)

“customer site” for a. A minimum of 3 weeks, before spreading (no turning required). page Remediation (NZ) Ltd RW-P-751-001-B Organic Production Protocols Greenwaste Composting & Vermiculture - 8 - b. A cover should be applied to reduce excess moisture retention from rain events. c. The Revital contract spreader will ensure that before the product is spread it has met 2(a) above, and the spreading records will be filed as part of the

2. National Objectives Framework

freshwater quality is good to excellent, with rivers falling within quality bands A to B as set out in the NOF. The region’s small number of lakes largely fall within the bands A to C. Where the A to C grading is not achieved, the causes are generally natural and thus exempt from national bottom line requirements. In many cases, the Taranaki Regional Council already monitors waterway health more intensively than is required under the NOF, and has a very detailed

Schedule of charges - Annual Plan 2023/2024

hydrometric equipment $680.90 per year Tawhiti hydrometric equipment (lower) $1,730.30 per year Tawhiti hydrometric equipment (upper) $1,070.30 per year Waingongoro hydrometric equipment $830.50 per year Waitaha hydrometric equipment $8,091.60 per year Rain Gauge Calibration $336.60 per deployment Chlorine Meter $20.80 per use Drone $132.00 per day Multi-parameter Field Meter $112.20 per day Haehanga hydrometric equipment $2,383.20 per year EXPLANATION This scale of charges is used to

Todd McKee Power Plant Annual Report 2023-2024

of the RMA stipulates that no person may take, use, dam or divert any water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant into water, unless the activity is

Todd Energy Aquatic Centre Annual Report 2023 2024

consent or a rule in a regional plan, or it falls within some particular categories set out in Section 14. Permits authorising the abstraction of water are issued by the Council under Section 87(d) of the RMA. Water discharge permits Section 15(1)(a) of the RMA stipulates that no person may discharge any contaminant into water, unless the activity is expressly allowed for by a resource consent or a rule in a regional plan, or by national regulations. Permits authorising discharges to water