Regional Transport Agenda Feb 2024
Regional Transport Agenda Feb 2024
Regional Transport Agenda Feb 2024
discharge points to the stream were observed, with no effects evident in the stream as a result of stormwater discharging offsite. A new flare stack had been installed to flare natural gas venting from the hydrocarbon storage tanks. The separation equipment was all functional and operating as required. The pilot flares were clean burning with no sign of smoke. 22 November 2018 Heavy rain had fallen the day prior to the inspection. No hydrocarbon sheens were noted in puddles or within
Fonterra Kapuni Annual Report 2023-2024
Manawa Energy - Patea HEPS Annual Report 2023-2024
Waste Remediation Services Symes Manawapou LF Annual Report 2023 2024
Waste Remediation Services WRS Waikaikai LF Annual Report 2023-2024
groundwater levels as a result of the authorised abstraction. During the period under review, groundwater levels measured within monitoring bore GND2103 varied in response to abstraction from GND2010. When abstraction volumes increase over the summer months the groundwater levels fall in response and during the winter months, when abstraction decreases, the groundwater levels recover. In summary, groundwater level monitoring data gathered by the Council does not indicate any long-term
revenue streams. Port Taranaki Ltd operates in a highly- competitive trading environment and there are no guarantees that it will be able to continue to deliver forecast dividend levels. Accordingly there is a risk that profits and dividends may fall at some future point. This is the biggest risk to the delivery of the Council’s proposed programmes. Over the ten years, there are fluctuations in the level of changes in general rates. Unchanged, these fluctuations would result in
response. Contact: Marcia Reynolds Steve Brown Phone: 06-757 3900 06-757 3900 0272419444 page Document #: 1024851 Taranaki Trained Responders as at 14 Oct 2020 (up-to-date list in WEBEOC) Responder Name Responder Employee Response Level Support Staff Specialist Role Du Fall First Gas Regional Alan Coldrick Port Taranaki Regional Albert Plant Port Taranaki Regional Bart Jansma Riverwise Consulting Regional Brian
below. Records of production and incinerator operation were inspected and found to be satisfactory. 1 September 2015 The inspection was conducted during light showers, with 47.5 mm of rain recorded over the previous few days at the New Plymouth Wastewater Treatment Plant (NPWWTP). Some pollen was present on the surface of SV8000, otherwise the ponds were relatively clear. The incinerator was in the process of starting up after a blocked liquids nozzle had been cleaned. Recent