Your search for 'iwi map' returned 2188 results.

Remediation hearing - submitters' expert evidence - Ngāti Mutunga (Kathryn Jane McArthur)

objectives and limits in water policy. I have provided evidence in these topic areas before the Environment Court, and in Board of Inquiry and council hearings processes across the country. page 4 5. I have provided ecological, water quality and freshwater policy advice to Nelson City Council, Northland Regional Council, Horizons Regional Council, Ngāti Kahungunu Iwi Incorporated, Ngāti Pāhauwera Development Trust, Te Rōpū Taiao o Ngāti Whakatere, Te Taiwhenua o

Weather study unit

.................................................................................................................................................... 22 Activity 9...................................................................................................................................................................... 23 Reading the Weather Map ..................................................................................................................................... 23 Activity 10

Appendix 6: Demolition proposal

boiler & pipework—4 weeks Baptist Church, Papakura, Crocidolite to Ceiling—4 weeks CEPI, plant room 1 week Thames school, Amosite boiler & pipework—3 weeks 2000—Consulting & Management for Opus Consultants Hamilton Boys High, Amosite boiler & pipework—2 months Whakatane High School, Amosite pipework—3 weeks Thames Hospital, Amosite Debris cleanup—3 weeks Coromandel Police station, Amosite pipework—1 week Nga Iwi Primary school, Mangere, Amosite Pipework—3 weeks Thames High School,

web Fonterra appeal

and reconstruction. Retain the definition of Repair as notified. SECTION – PLAN MAPS 41 Map 31 Support Fonterra supports the classification of the coastal marine environment in the vicinity of Whareroa as Open Coast. Retain the classification of coastal marine environment in the vicinity of Whareroa as notified. page Further Submissions on Proposed Coastal Plan for Taranaki Fonterra Limited (3 August 2018) 1 FONTERRA LIMITED

Relationships between MCI, site altitude & distance from source for Taranaki ring plain streams

log10(Ds) EQN10 Where A = site altitude (m above mean sea level) and Ds = distance from source (km). Although these equations were developed from data collected from RPNP streams, they performed better when applied to RPOP streams than relationships developed using data from RPOP streams. Comparison of maps of Taranaki overlaid with average MCI values in six stream/river health classes calculated from macroinvertebrate samples collected throughout the region

McKechnie Aluminium Solutions Ltd Annual Report 2023-2024

up as remnants were tracking towards the drain. By 27 June the waste bins with paint boxes had been cleaned up promptly, but the powder coating area was still generally messy with rubbish and it was advised to keep on top of housekeeping in this area. 2.1.2 Results of discharge and receiving water monitoring Sampling locations are described in Table 2 and indicated on the map in Figure 2. Table 2 Locations and details of sampling sites Site Location GPS coordinates Site code

Beach Energy Resources Kupe Production Station Annual Report 2022-2023

effects No maintenance during period under review N/A 7. Disturbance to comply with noise standards No maintenance during period under review N/A 8. Survey and map of position of pipeline to be provided Provided by consent holder Yes page 19 Purpose: To erect, place, use, reconstruct, alter, extend and maintain within the coastal marine area up to six pipelines connecting an offshore wellhead/platform to the foreshore at mean high water spring, with structures

Calendar of events Terms 3 4 2023

school support terms 3 & 4 from us We’re here to support you. You can choose from the topics below - Gardens get ready for Spring - Waste systems & compost beds - Connection to nature hikoi - Eco building – teepees, bird/bat houses - Vision Mapping - Student leadership activities - Conservation activities Just get in touch with your Facilitator for support. Contact details are at the end of this document. page Climate Education Teaching for a changing climate Climate

NPDC Urenui and Onaero Beach Camps Annual Report 2021-2022

1389-3 13 Table 11 Evaluation of environmental performance by NPDC over time 14 List of figures Figure 1 Map of sampling sites and other features of interest at Urenui Beach Camp 5 Figure 2 Map of sampling sites and other features of interest at Onaero Bay Holiday Park 6 Figure 3 Supplied flow meter data from NPDC for Urenui Beach Camp (01 July 2021 – 30 June 2022) 8 Figure 4 Supplied flow meter data from NPDC for Onaero Bay Holiday Park (1 July 2021– 30 June 2022) 10