objectives and limits in water
policy. I have provided evidence in these topic areas before the Environment Court,
and in Board of Inquiry and council hearings processes across the country.
page
4
5. I have provided ecological, water quality and freshwater policy advice to Nelson City
Council, Northland Regional Council, Horizons Regional Council, Ngāti Kahungunu
Iwi Incorporated, Ngāti Pāhauwera Development Trust, Te Rōpū Taiao o Ngāti
Whakatere, Te Taiwhenua o
.................................................................................................................................................... 22
Activity 9...................................................................................................................................................................... 23
Reading the Weather Map ..................................................................................................................................... 23
Activity 10
boiler & pipework—4 weeks
Baptist Church, Papakura, Crocidolite to Ceiling—4 weeks
CEPI, plant room 1 week
Thames school, Amosite boiler & pipework—3 weeks
2000—Consulting & Management for Opus Consultants
Hamilton Boys High, Amosite boiler & pipework—2 months
Whakatane High School, Amosite pipework—3 weeks
Thames Hospital, Amosite Debris cleanup—3 weeks
Coromandel Police station, Amosite pipework—1 week
Nga Iwi Primary school, Mangere, Amosite Pipework—3 weeks
Thames High School,
and reconstruction.
Retain the definition of Repair as notified.
SECTION – PLAN MAPS
41 Map 31 Support Fonterra supports the classification of the coastal
marine environment in the vicinity of Whareroa as
Open Coast.
Retain the classification of coastal marine
environment in the vicinity of Whareroa as notified.
page
Further Submissions on Proposed Coastal Plan for Taranaki
Fonterra Limited (3 August 2018) 1
FONTERRA LIMITED
log10(Ds) EQN10
Where A = site altitude (m above mean sea level) and Ds = distance from source (km).
Although these equations were developed from data collected from RPNP streams, they
performed better when applied to RPOP streams than relationships developed using data from
RPOP streams.
Comparison of maps of Taranaki overlaid with average MCI values in six stream/river health
classes calculated from macroinvertebrate samples collected throughout the region
up as remnants were tracking towards the drain. By 27 June the
waste bins with paint boxes had been cleaned up promptly, but the powder coating area was still generally
messy with rubbish and it was advised to keep on top of housekeeping in this area.
2.1.2 Results of discharge and receiving water monitoring
Sampling locations are described in Table 2 and indicated on the map in Figure 2.
Table 2 Locations and details of sampling sites
Site Location GPS coordinates Site code
effects
No maintenance during period under review N/A
7. Disturbance to comply with
noise standards No maintenance during period under review N/A
8. Survey and map of position of
pipeline to be provided Provided by consent holder Yes
page
19
Purpose: To erect, place, use, reconstruct, alter, extend and maintain within the coastal marine area up to six
pipelines connecting an offshore wellhead/platform to the foreshore at mean high water spring, with
structures
school support terms 3 & 4
from us
We’re here to support you. You
can choose from the topics below
- Gardens get ready for Spring
- Waste systems & compost
beds
- Connection to nature hikoi
- Eco building – teepees,
bird/bat houses
- Vision Mapping
- Student leadership activities
- Conservation activities
Just get in touch with your
Facilitator for support. Contact
details are at the end of this
document.
page
Climate Education
Teaching for a changing climate
Climate
1389-3 13
Table 11 Evaluation of environmental performance by NPDC over time 14
List of figures
Figure 1 Map of sampling sites and other features of interest at Urenui Beach Camp 5
Figure 2 Map of sampling sites and other features of interest at Onaero Bay Holiday Park 6
Figure 3 Supplied flow meter data from NPDC for Urenui Beach Camp (01 July 2021 – 30 June 2022) 8
Figure 4 Supplied flow meter data from NPDC for Onaero Bay Holiday Park (1 July 2021– 30 June
2022) 10