Your search for 'notification' returned 1553 results.

Ordinary Council Agenda August 2023

Committee: a) received the memorandum ‘Endorsement to commence an interim review of Taranaki Civil Defence Emergency Management Group Plan (2018-2023)’ b) noted the content of this memorandum c) approved Option 3 – A limited interim review and update of the current Group Plan (inclusive of the updated risk assessment process) commencing in March 2023 d) approved public notification of the planned interim review as outlined in the communications plan (appendix ‘D’) e) noted

Rimu PS consent monitoring 2020-2021

tributary of the Manawapou River Condition requirement Means of monitoring during period under review Compliance achieved? 11. Effects not to occur in receiving waters beyond the established mixing zone Water sampling and visual inspection Yes 12. Notification prior to reinstatement of the site Site in use N/A 13. Optional review provision re environmental effects Option for review in June 2022. Recommendation attached in Section 3.6 N/A Overall assessment of consent

Ahuroa B gas storage consent monitoring 2018-2019

unnamed tributary of the Makara Stream in the Waitara catchment Condition requirement Means of monitoring during period under review Compliance achieved? 1. Adopt best practicable option to prevent or minimise adverse effects Inspections Yes 2. Catchment area limited Inspections and records Yes 3. Notification provided prior to commencement of site works or drilling Not undertaken during period under review N/A page 19 Purpose: To discharge

Methanex Motunui and Waitara Valley Combined Monitoring Annual Report 2020 2021

regularly provided consent holder data and two inter-laboratory comparisons. The monitoring showed that Methanex operated both sites in accordance with the requirements of their resource consents. As in previous years, the facilities were well managed and a high level of housekeeping was maintained. During the year, Methanex demonstrated a high level of environmental performance with their resource consents. During the year under review a couple of reports were received late and notification

Annual report 2015-2016

One issue of note was that during the inspection of 4 December it was noted that the there had been several discharges recorded in the log where no notification had been sent to the Council (as required by consent conditions). An incident was raised as a result of this and this is discussed in section 2.2.4.

Council meeting agenda October 2018

McIntyre B K Raine N W Walker C S Williamson Apologies Notification of Late Items Item Page Subject Item 1 3 Confirmation of Minutes Item 2 10 Consents and Regulatory Committee Minutes Item 3 16 Policy and Planning Committee Minutes Item 4 22 Executive Audit and Risk Committee Minutes Item 5 26 Joint Committee Minutes Item 6 30 Meeting Dates October 2018 Item 7 31 Presentation - Council website upgrade Item 8 32 Public Excluded Item 9 33 Yarrow

Report 2012-2013

TAG Oil Sidewinder wellsite consent monitoring report - Taranaki Regional Council.

Greymouth Turangi-C monitoring report 2016-2018

best practicable option. Conditions 2 and 3 detail limits on discharge area and rate. Conditions 4 to 6 detail the design of the stormwater system and skimmer pits. page 7 Condition 7 and 8 detail requirements for notification prior to works, and contingency plans. Condition 9 details further stormwater design and management systems. Condition 10 requires notification prior to reinstatement of the site. The last two conditions are lapse and review