Executive summary
Todd Petroleum Mining Company Ltd (Todd Petroleum) operates the Kapuni Production Station located on
Palmer Road in the Kapuni catchment. This report for the period July 2020 to June 2021 describes the
monitoring programme implemented by the Taranaki Regional Council (the Council) to assess Todd
Petroleum’s environmental and consent compliance performance during the period under review. The
report also
TARANAK I REG IO NAL CO UNCIL R IV ER AND F L O O D
P RO TECT IO N BYL AW 2020 Maps
28
Map 5c Defences against water between Ihaia Road and Waiaua River 2, Opunake.
page
TARANAK I REG IO NAL CO UNCIL R IV ER AND F L O O D
P RO TECT IO N BYL AW 2020 Maps
29
Map 5d Defences against water between Gisborne Terrace and Allison Street, Opunake.
Explanatory Note
Seal
Table of contents
Part 1 Preliminary provisions
1. …
page
Todd Energy Ltd
McKee Production Station
Monitoring Programme
Annual Report
2016-2017
Technical Report 2017-56
Taranaki Regional Council
ISSN: 1178-1467 (Online) Private Bag 713
Document: 1918851 (Word) STRATFORD
Document: 1988106 (Pdf) March 2018
page
page
Executive summary
Todd Energy Ltd operates a petroleum production station located on Otaraoa Road near Tikorangi, bridging
the
Energy) operates a petroleum production station located on Otaraoa Road near
Tikorangi, bridging the Waitara and Onaero catchments. The McKee Mangahewa Production Station
processes condensate and natural gas from Todd Energy’s McKee and Mangahewa groups of wellsites and
includes electricity generation and LPG production facilities. This report for the period July 2018 to June
2019 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to
assess Todd Energy’s
discharge to ensure that it
complies with resource consent conditions. The ring drains were inspected and they
were found to be not sufficient to contain and direct all stormwater from the site to
the skimmer pits.
page
15
Pipe running under one of the access tracks appeared blocked causing water to pond
in the ring drain. A trench had been dug in the ring drain which would allow
stormwater to discharge offsite during a wet period, without being directed for
treatment in
(kg/month)
Percentage
of process
effluent
g/m3 of
process
effluent
Percentage
of total
discharge
g/m3 of
total
discharge
Total discharge to sea - 2,000,402 - - - -
The Company's best estimate of rainwater runoff is estimated to account for between half and two thirds of
the total yearly discharge when in operation. This is due to the fact that much of the runoff from the factory
roof, plus additional amounts from the car park and road enter the wastewater
Review Date(s): June 2010, June 2016
Site Location: Waiinu Beach Settlement, Waiinu Beach Road, Waitotara
Legal Description: Road Reserve Waiinu Beach Settlement Waitotara
Catchment: Waitotara
page
Consent 3769-3
General conditions
a) On receipt of a requirement from the Chief Executive, Taranaki Regional Council the consent
holder shall, within the time specified in the requirement, supply the information required
relating to the exercise
(kg) - 1,000,402 - - - -
Rainwater runoff (rough
estimate)
- 1,000,000 - - - -
Total discharge to sea - 2,000,402 - - - -
The Company's best estimate of rainwater runoff is estimated to account for between
half and two thirds of the total yearly discharge when in operation. This is due to the
fact that much of the runoff from the factory roof, plus additional amounts from the car
park and road enter the wastewater system.
Figure 1 Location of the factory and marine outfall