Your search for '95 manutahi road bell block' returned 2575 results.

Todd Petroleum Mining Company Kapuni Production Station Annual Report 2020 2021

(Pdf) March 2022 page page Executive summary Todd Petroleum Mining Company Ltd (Todd Petroleum) operates the Kapuni Production Station located on Palmer Road in the Kapuni catchment. This report for the period July 2020 to June 2021 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess Todd Petroleum’s environmental and consent compliance performance during the period under review. The report also

Proposed River Control & Flood Protection Bylaw for Taranaki

TARANAK I REG IO NAL CO UNCIL R IV ER AND F L O O D P RO TECT IO N BYL AW 2020 Maps 28 Map 5c Defences against water between Ihaia Road and Waiaua River 2, Opunake. page TARANAK I REG IO NAL CO UNCIL R IV ER AND F L O O D P RO TECT IO N BYL AW 2020 Maps 29 Map 5d Defences against water between Gisborne Terrace and Allison Street, Opunake. Explanatory Note Seal Table of contents Part 1 Preliminary provisions 1. …

Annual report 2016-2017

page Todd Energy Ltd McKee Production Station Monitoring Programme Annual Report 2016-2017 Technical Report 2017-56 Taranaki Regional Council ISSN: 1178-1467 (Online) Private Bag 713 Document: 1918851 (Word) STRATFORD Document: 1988106 (Pdf) March 2018 page page Executive summary Todd Energy Ltd operates a petroleum production station located on Otaraoa Road near Tikorangi, bridging the

McKee Mangahewa PS consent monitoring 2018-2019

Energy) operates a petroleum production station located on Otaraoa Road near Tikorangi, bridging the Waitara and Onaero catchments. The McKee Mangahewa Production Station processes condensate and natural gas from Todd Energy’s McKee and Mangahewa groups of wellsites and includes electricity generation and LPG production facilities. This report for the period July 2018 to June 2019 describes the monitoring programme implemented by the Taranaki Regional Council (the Council) to assess Todd Energy’s

Report 2014

discharge to ensure that it complies with resource consent conditions. The ring drains were inspected and they were found to be not sufficient to contain and direct all stormwater from the site to the skimmer pits. page 15 Pipe running under one of the access tracks appeared blocked causing water to pond in the ring drain. A trench had been dug in the ring drain which would allow stormwater to discharge offsite during a wet period, without being directed for treatment in

Annual report 2016-2017

(kg/month) Percentage of process effluent g/m3 of process effluent Percentage of total discharge g/m3 of total discharge Total discharge to sea - 2,000,402 - - - - The Company's best estimate of rainwater runoff is estimated to account for between half and two thirds of the total yearly discharge when in operation. This is due to the fact that much of the runoff from the factory roof, plus additional amounts from the car park and road enter the wastewater

Annual report 2016-2017

Review Date(s): June 2010, June 2016 Site Location: Waiinu Beach Settlement, Waiinu Beach Road, Waitotara Legal Description: Road Reserve Waiinu Beach Settlement Waitotara Catchment: Waitotara page Consent 3769-3 General conditions a) On receipt of a requirement from the Chief Executive, Taranaki Regional Council the consent holder shall, within the time specified in the requirement, supply the information required relating to the exercise

Annual report 2015-2016

(kg) - 1,000,402 - - - - Rainwater runoff (rough estimate) - 1,000,000 - - - - Total discharge to sea - 2,000,402 - - - - The Company's best estimate of rainwater runoff is estimated to account for between half and two thirds of the total yearly discharge when in operation. This is due to the fact that much of the runoff from the factory roof, plus additional amounts from the car park and road enter the wastewater system. Figure 1 Location of the factory and marine outfall